Certifications & Official Approvals

Our company operates in strict compliance with national and international standards for armored vehicle manufacturing and ballistic protection systems. The certifications and official documents presented on this page demonstrate our commitment to quality, safety, and regulatory compliance.

These documents include government approvals, ballistic testing reports, and official authorizations related to armored vehicle conversions, bullet-resistant glass installations, and protected vehicle manufacturing.

Each certification verifies that our armored solutions meet the required standards for security, durability, and operational performance. Independent testing organizations and government authorities have reviewed and approved these certifications to ensure that our armored vehicles and protective systems provide reliable protection in high-risk environments.

Through these verified certifications, we assure our clients that every armored project we deliver is built according to approved procedures, tested materials, and internationally recognized safety requirements.

About the Certificates

NOC for Setting Up of Armouring Company
This document represents official authorization issued by the Government authorities allowing the establishment and operation of an armoring and protected vehicle conversion company under defined regulations and security policies.

Ballistic Testing Report of Bulletproof Glass
This report confirms that the bullet-resistant glass used in our armored vehicles has undergone ballistic testing against various calibers of ammunition to verify its protective capability and compliance with required ballistic standards.

Representative Agreement / Authorization Letter
This certificate authorizes partnership and representation between organizations for the supply, installation, and integration of armored vehicle components and security solutions.

CEMAR INTERNATIONAL INDUSTRIAL LLC.
SM TRADERS
Plot No 217, Deh Sardar Ahmed Canal
Korangi Industrial Area Sector 31
Karachi Pakistan
Date: 09/11/2024
Representative Agreement

Cemar International hereby declare that SM TRADERS (Secure Motors Tactical Armored Cars), is our representative for Pakistan to supply our complete range of products.

This agreement includes authorization to participate in bids, product supplying, product sales and sharing of technical data as may be necessary to International Agencies operating in Pakistan, Government, Semi-Government, Paramilitary and other agencies in Pakistan.

This agreement shall be for a period of one year.

This agreement may be terminated at any time and for any reason by either party giving the other party notice from 120 days’ notice of termination.

P.O.Box 88482, Plot NO. R-7000, Technohub, Dubai UAE
F. NO. 6/29/2020-CD
GOVERNMENT OF PAKISTAN
MINISTRY OF INTERIOR
Islamabad the 13th December 2023
NOC FOR SETTING UP OF ARMOURING COMPANY

This is in reference to the application dated 7th September, 2021 regarding establishment of armouring/retrofitting company by M/S SM Traders, Karachi subject to the following conditions:

  1. M/S SM Traders shall not make retrofitting unless the vehicle owner has obtained NOC from Ministry of Interior.
  2. M/S SM Traders shall confirm authenticity of each NOC before retrofitting vehicles.
  3. Retrofitting shall be carried out at the approved place and address only.
  4. The company shall follow Policy/SOPs on Armoured Vehicles issued by Ministry of Interior.
  5. The company shall maintain complete record of retrofitted vehicles.
  6. All raw material imports must follow the Import Policy Order.
  7. Record of raw material imports shall be provided to authorities when required.
  8. The Ministry may inspect facilities at any time to verify compliance with policies and SOPs.

This issues the approval of Competent Authority.

Copy to:
Secretary MOI Commerce Islamabad
Chairman FBR Islamabad
Director General ISI Islamabad
Director General IB Islamabad
BALLISTIC TESTING REPORT OF BULLET PROOF GLASSES
Testing Sample Glass Specimen Req By M/S SMTRAC
Testing Date 05 Sep 2024 Firm Name M/S SMTRAC
Testing Std / Req EN-1522/23 BR6 Level with 7.62 × 39 mm SCP Witnessed By RDE Officials
Weapons Cal MV (m/sec) Bullet Type Firing Distance
G3A3 7.62 × 51 mm 800 ± 15 Full Metal Jacketed 10 m
AK-47 7.62 × 39 mm 710 ± 15 Steel Core 10 m
INSAS 5.56 × 45 mm 914 ± 15 Steel Core 10 m
Disclaimer: This report represents testing performed on supplied samples. The results cannot be used in legal proceedings without proper authorization.
Tanveer Akmal
Commander Pak Navy
Assistant Director (WSSV)

F. No. 6/29/2020-CD

GOVERNMENT OF PAKISTAN

MINISTRY OF INTERIOR

Islamabad the 13th December 2023

Subject: NOC FOR SETTING UP OF ARMOURING COMPANY

I am directed to refer to your application dated 7th September, 2021 and to convey that this Ministry has No Objection for establishment of armouring/retrofitting company by M/S SM Traders, Karachi subject to following conditions:

  1. M/S SM Traders shall not make retrofitting of any vehicle(s) unless owner of vehicle has obtained NOC from Ministry of Interior.
  2. M/S SM Traders shall confirm authenticity of each NOC from Ministry of Interior prior to retrofitting.
  3. M/S SM Traders shall carry out retrofitting work at the address indicated by them.
  4. M/S SM Traders should adhere to Policy/SOPs on Armoured Vehicles-2017 issued by Ministry of Interior.
  5. M/S SM Traders shall maintain complete record of retrofitted vehicles.
  6. M/S SM Traders shall provide record of raw material imported for retrofitting.
  7. Ministry of Interior may require inspection at any time to verify facilities/equipment.

2. This issues with the approval of Competent Authority.

Mr. Khurram Hamirani s/o Ali Hamirani
Chief Executive Officer
M/S SM Traders
House No.2 St No.1 Sher Avenue DHA Phase-I
Karachi
Muhammad Ayaz
Deputy Secretary (Security)
Copy to:
  • Secretary, MoI, Islamabad
  • Chairman, FBR, Islamabad
  • Directorate General ISI, Islamabad
  • Directorate General IB, Islamabad

RESULT

Ser Sample No (Glass) Non Firing Test Calibres Round No Result Remarks
Dimensions (mm) Thickness (mm)
1 01 500 × 500 45.5 7.62×39mm AK 1st / 2nd / 3rd All Rds Stopped –
2 02 500 × 500 45.8 7.62×51mm G3 1st / 2nd / 3rd –
3 03 500 × 500 45.9 5.56×45mm INSAS 1st / 2nd / 3rd –

Disclaimer: The test report represents and covers only samples tested. This test report cannot be made subject to litigation in a court of law.

BALLISTIC TESTING REPORT OF BULLET PROOF STEEL PLATES

Testing Sample Bullet Proof Steel Plates Req By M/S SMTAC
Testing Date 05 Sep 2024 Ref RDE No 26/169/2023
Testing Standard EN-1522/23 Witnessed By Mr Junaid
Weapon Cal MV (m/sec) Bullet Type Firing Distance (M)
G3A3 7.62×51mm 800±15 Full Metal Jacketed 10
AK-47 7.62×39mm 710±15 Steel Core 10
INSAS 5.56×45mm 914±15 Steel Core 10

Disclaimer: The test report represents and covers only samples tested and cannot be used for litigation purposes.